The challenge: Development of a new transformer station concept to limit the lifting weight for the use of a bandwidth of smaller/mid-size installation vessels (crane capacity up to 2,500 t).

We continuously rely on state-of-the-art technology in our projects to achieve the best possible efficiency in energy generation and at the most reasonable costs for electricity production.

Sea Wind Management, in cooperation with JBO Ingenieure GmbH and Siemens Gamesa Renewable Energy, S.A., has developed several concepts for transformer station platforms for the Baltic Eagle offshore project as part of its activity as the “Owner’s Engineer”. In addition to the main objective of designing a platform that can be installed with relatively small installation vessels, another task was to reconcile the technical and commercial requirements of the project and and the network operator 50Hertz. Two concepts were developed as part of the study: mother/daughter concept – closed design with module weight of 1,200 and 2,000 tonnes – Separate OTM® Open design with 2×2 OTM®s with a module weight of 800 tonnes each.

If you want to know more about my experience, please contact me
Jörg Thumann
Contact me
More References
Consulting
Consulting
Installation of 1600-tonne piles
Project management during the design of a logistics concept for floating installation.
Read more
Consulting
Consulting
62 WTGs & Monopiles installed in one summer
Project management during the optimisation of a wind farm installation
Read more
Insights
Insights
Polands steps forward in Offshore wind
The decisions of the next few years will point the way into the future
Read more

SEA WIND MANAGEMENT GMBH

Alter Wall 65 20457 Hamburg, Germany ​
Tel: +49 40 35 983 69 00

SEA WIND POLSKA SP. Z O.O.

Ul. Tadeusza Wendy 15 81-341 Gdynia, Poland
Tel: +48 58 688 81 00