Sea Wind Management, as part of its activity as the “Owner’s Engineer”, has ensured project management of the Baltic Eagle offshore project during the design phase of an XXL monopile. The key challenge was to provide the technical proof of a monopile foundation for an 8 MW wind power plant in very difficult subsoil conditions of the Arkona Basin of the Baltic Sea and at a water depth of up to 45 m.

We continuously rely on state-of-the-art technology in our projects to achieve the best possible efficiency in energy generation and at the most reasonable costs for electricity production.

25m of weak sediments in the upper soil layer

The key challenge was to provide the technical proof of a monopile foundation for an 8 MW wind power plant in very difficult subsoil conditions of the Arkona Basin of the Baltic Sea and at a water depth of up to 45 m. In cooperation with Gud Consult GmbH, JBO Ingenieure GmbH, HPC – Hanseatic Power Cert GmbH and Siemens Gamesa Renewable Energy, S.A., it was possible to provide technical proof of feasibility for the statics, design, production and offshore installation.

If you want to know more about my experience, please contact me
Sascha Lindemann
Managing Director Sea Wind Polska, Managing Director Sea Wind Management GmbH
Contact me
More References
Consulting
Consulting
Installation of 1600-tonne piles
Project management during the design of a logistics concept for floating installation.
Read more
Consulting
Consulting
62 WTGs & Monopiles installed in one summer
Project management during the optimisation of a wind farm installation
Read more
Investing
Investing
Investing in Baltic Eagle
An offshore wind farm project in the Baltic Sea
Read more

SEA WIND MANAGEMENT GMBH

Alter Wall 65 20457 Hamburg, Germany ​
Tel: +49 40 35 983 69 00

SEA WIND POLSKA SP. Z O.O.

Ul. Tadeusza Wendy 15 81-341 Gdynia, Poland
Tel: +48 58 688 81 00